The subject of the contract was the implementation of insulated production spaces. The hall was dimensioned and delivered with a bridge crane and equipped with an air conditioning unit. The implementation was again carried out in a uniform color scheme of the builder so that the building was not only a functional but also an aesthetic whole of the entire area.
Call +420 773 644 448