The subject of the contract was the implementation of an uninsulated warehouse hall with a technical textile cladding, on which a print was designed so that the cladding was in a similar color to the existing hall. In addition, a simple dividing partition made of technical textile with a passage for separating the space was designed inside the hall.
call +420 773 644 448