The subject of the contract was the implementation of an insulated hall for the installation of the cooling boxes themselves inside the building. The implementation was carried out on a so-called "turnkey" basis, i.e. including the implementation of the foundation, floors, cooling boxes, electrical installations, etc. During the implementation, we and the builder primarily addressed the aesthetic design, so that the construction would be consistent with both the previous construction of the insulated warehouse hall that we had implemented and the existing administrative part.