The subject of the contract was the implementation of the third stage of insulated production and storage facilities. The implementation was carried out according to the wishes of the builder, with the solution of all details and continuity with the connection of the existing hall already implemented by us. A specific part is the implementation of a suspended roof of above-standard dimensions. There was very active cooperation between the builder and the architect on the construction site to achieve the best possible technical and economic construction solutions.
Call +420 773 644 448